Centre
de Recerca
Experimental
Biomèdica
Aplicada

Recursos
Biomedical
research
support
resources
Animal facility
Animal Facility for Pig Housing. The facility includes three housing rooms with capacities for 16, 16, and 4 animals respectively (total capacity: 36 pigs up to 50 kg in weight). It features a controlled environment compliant with current regulations (Directive 2010/63/EU and Royal Decree 53/2013), and is registered as a user center for experimental animals (registration no. L9900008). Additionally, the center is authorized to use genetically modified animals.
Animal care, handling (basic and experimental), and supervision are carried out by two veterinarians and two technicians, all of whom hold the required certifications in accordance with current legislation.
3 Individual Operating Rooms



Experimental operating rooms of 43 m² each. The structure and construction were carried out in accordance with the standards of human medical operating rooms.
Facilities and fixed equipment of each operating room
1 Multiple Operating Room



Operating room of 88 m². The structure and construction were carried out in accordance with human medical operating room standards.
Facilities and Fixed Equipment of the Multiple Operating Room:
Equipment for in vivo imaging



Parasympathetic Tone Monitoring Equipment (PTA)
Laboratory

Equipment
3D printing room

Equipamiento
Meeting room




In all training activities, CREBA manages the following services and procedures associated with the training activity:
Advisory services:
- Methodological
- Veterinary
- Surgical
- Project writing
- Presentation of results
- Publication writing
Resources
for training
activities
Classroom
for 30 people

Equipment
Classroom
for 10 people

Equipment
Other
Equipment

3 Individual Operating Rooms



Experimental operating rooms of 43 m² each. The structure and construction were carried out in accordance with the standards of human medical operating rooms.
Facilities and fixed equipment of each operating room
1 Multiple Operating Room



Operating room of 88 m². The structure and construction were carried out in accordance with human medical operating room standards.
Facilities and Fixed Equipment of the Multiple Operating Room:
Mobile Equipment



Classroom
53 m² classroom with mobile furniture
Simulation Room
32 m² room equipped with
Multiple Operating Room



Operating room of 88 m². The structure and construction were carried out in accordance with human medical operating room standards.
Facilities and Fixed Equipment of the Multiple Operating Room:
Equipamiento móvil
Special equipment
Other materials



In all training activities, CREBA manages the following services and procedures associated with the training activity:
Management of the accreditation process for training activities by:
- Commission for Continuing Medical Education
- Scientific societies
- European Accreditation Council for Continuing Medical Education

